首页 社会内容详情
KPower gets four-year PPA extension

KPower gets four-year PPA extension

分类:社会

网址:

SEO查询: 爱站网 站长工具

点击直达

皇冠体育网址www.hg108.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。皇冠体育网址APP上最新登录线路、新2皇冠体育网址更新最快。皇冠体育网址开放皇冠官方会员注册、皇冠官方代理开户等业务。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

足球免费贴士www.hgbbs.vip)是国内最权威的足球赛事报道、预测平台。免费提供赛事直播,免费足球贴士,免费足球推介,免费专家贴士,免费足球推荐,最专业的足球心水网。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。
  • 皇冠网址(www.hg108.vip) @回复Ta

    2022-09-05 00:10:30 

    According to reports, given the positive gross domestic product (GDP) growth of 8.9 per cent in the second quarter of 2022 (Q2 2022), Finance Minister Tengku Datuk Seri Zafrul Aziz expects that Malaysia’s growth will continue to accelerate in Q3 2022, driven by private consumption.心情都调整了呢

发布评论